ZEMCH 2015 - International Conference Proceedings | Page 372

Figure 9: BAM Waste Production per destination category, BAM CSR report 2012-13 The waste statistics are collected and reported in quarterly basis in order to monitor the recycling process. The group has targeted to reduce the amount of waste resulted from offices and construction sites as one of their man Corporate Social Responsibility objective. BAM has succeeded in achieving this objective in 2012 where the generated construction and office waste was reduced by 15%. The excavation and demolishing waste were no included in the target since they are not controlled by BAM and they are more related to the project’s nature. Figure 10: Waste production per source (in kilotons), BAM CSR Report 12-13 370 ZEMCH 2015 | International Conference | Bari - Lecce, Italy