The Master Painter Australia - April 2016 Vol. 1 | Page 17
PLANNING FUTURE SITES
Can we return all
paint products?
The following list outlines the
products that Paintback will
and will not accept:
Accepted
• Interior and exterior
architectural paint
• Deck coatings and floor
paints
• Primers, undercoats and
sealers
• Stains and shellacs
• Varnishes and urethanes
(single component)
• Wood coatings
FURTHER WORK ON PROPOSED
LAUNCH LOCATIONS
Paintback is in discussions with the
sites (below) to be its first collection
points for waste paint. It is working
with these sites on operating
arrangements ready for the launch
in May 2016.
STATE
Locations
NSW
Liverpool, Port Stephens
(Salamander Bay), Moss Vale,
4th site to be advised
QLD
Nudgee, Willawong
SA
Edinburgh North, North
Plympton
VIC
Banyule, Geelong, Monash,
Mornington
WA
Balcatta, Tamara Park
• Packaging
Not Accepted
• Industrial maintenance
coatings
• Original equipment
manufacturer (e.g. car
manufacturing) and industrial
surface coating (shop
application) paints and
finishes
• Aerosol paints
• Automotive paints
• Anti-fouling coatings
• Melamine, metal and rust
preventative
• Caulking compounds,
epoxies, glues or adhesives
• Colourants and tints
• Resins
• Paint thinners, mineral spirits
or solvents
• Paint additives
• Roof patch or repair
• Tar-based or bitumen-based
products
• Two-component coatings
• Traffic paints
• Texture coatings
• Bagged renders
• Isocyanates
• Metal coatings
• Paint washings
FURTHER INFORMATION
Contact Amanda Dutt Sharma
Marketing and Communications Manager
P: 03 9670 3076
E: [email protected]
Please visit our website at
paintback.com.au or connect
with us via our social media
sites for further information.
NEXT AREAS OF INTEREST
The sites above are just the start. To
provide further coverage, Paintback
is interested in establishing collection
sites that include Canberra, Darwin,
Hobart and Launceston and further
afield in New South Wales, Queensland,
South Australia, Victoria and Western
Australia (subject to relevant approvals
and building sites being available).
LOCATION
ROLLOUT
TARGETS
STAGE ONE (COMMENCE)
MAY 2016
14
Paintback Collection
Sites Open
STAGE ONE (COMPLETE)
END 2016
30
Paintback Collection
Sites Open
STAGE TWO
FROM 2017
51
Paintback Collection
Sites Open
STAGE THREE
(FOOTPRINT COMPLETE)
FROM 2019
70
Paintback Collection
Sites Open