The Master Painter Australia - April 2016 Vol. 1 | Page 17

PLANNING FUTURE SITES Can we return all paint products? The following list outlines the products that Paintback will and will not accept: Accepted • Interior and exterior architectural paint • Deck coatings and floor paints • Primers, undercoats and sealers • Stains and shellacs • Varnishes and urethanes (single component) • Wood coatings FURTHER WORK ON PROPOSED LAUNCH LOCATIONS Paintback is in discussions with the sites (below) to be its first collection points for waste paint. It is working with these sites on operating arrangements ready for the launch in May 2016. STATE Locations NSW Liverpool, Port Stephens (Salamander Bay), Moss Vale, 4th site to be advised QLD Nudgee, Willawong SA Edinburgh North, North Plympton VIC Banyule, Geelong, Monash, Mornington WA Balcatta, Tamara Park • Packaging Not Accepted • Industrial maintenance coatings • Original equipment manufacturer (e.g. car manufacturing) and industrial surface coating (shop application) paints and finishes • Aerosol paints • Automotive paints • Anti-fouling coatings • Melamine, metal and rust preventative • Caulking compounds, epoxies, glues or adhesives • Colourants and tints • Resins • Paint thinners, mineral spirits or solvents • Paint additives • Roof patch or repair • Tar-based or bitumen-based products • Two-component coatings • Traffic paints • Texture coatings • Bagged renders • Isocyanates • Metal coatings • Paint washings FURTHER INFORMATION Contact Amanda Dutt Sharma Marketing and Communications Manager P: 03 9670 3076 E: [email protected] Please visit our website at paintback.com.au or connect with us via our social media sites for further information. NEXT AREAS OF INTEREST The sites above are just the start. To provide further coverage, Paintback is interested in establishing collection sites that include Canberra, Darwin, Hobart and Launceston and further afield in New South Wales, Queensland, South Australia, Victoria and Western Australia (subject to relevant approvals and building sites being available). LOCATION ROLLOUT TARGETS STAGE ONE (COMMENCE) MAY 2016 14 Paintback Collection Sites Open STAGE ONE (COMPLETE) END 2016 30 Paintback Collection Sites Open STAGE TWO FROM 2017 51 Paintback Collection Sites Open STAGE THREE (FOOTPRINT COMPLETE) FROM 2019 70 Paintback Collection Sites Open