P2S Magazine Special Edition | Page 11

PROJECT HIGHLIGHT
PROJECT HIGHLIGHT
California State University , Chico Central Plant Expansion Cx
About the Project P2S Commissioning is providing commissioning services for the new $ 13.4 million Central Plant Improvement Project at CSU Chico consisting of an addition of a new chiller and two new steam boilers that will be housed in the new addition to the plant building . A new cooling tower and new thermal storage tank will also be added to the site . The systems to be commissioned will be all the new chilled water equipment including chiller , cooling tower , pumps , TES tank and controls ; new steam production equipment including boilers , deaerator and controls ; interface of new equipment with existing equipment ; refrigerant monitoring and exhaust system , energy management and control systems .
Our Solutions Design and submittal review is being conducted so that layout , installation and operation of the equipment can be optimized and any changes that are needed can be implemented before the large equipment is on site . When the equipment is installed , piped , started up , and when the controls are set up and programmed , we will test the systems through their full range of operation . We will assist with setting each system up to operate efficiently and smoothly and to eliminate as many post-turnover operational issues as possible . We will monitor the system during the warranty period and assist the campus in facilitating correction of any deficiencies found as the system goes through its first year of operation .
PROJECT COST
$ 13.4 million
COMPLETION DATE
July 2017
FEATURES
Central plant housing chilled water and steam production equipment
11