What projects are new to this 5-year Program?
System Preservation Projects – keep county highway pavements, bridges, bikeways, signals and related
items in good condition
Route or Project Name
Work Description
Arlington Heights Rd (Lake Cook Rd to IL Rte 83)
Phase I engineering for reconstruction
Detention Right of Way 2018
Future stormwater detention sites
ITS PASSAGE network 2018
Upgrade existing equipment
NPDES Phase II 2018
Annual inspections of storm sewer outfalls
Signal Maintenance 2018
Traffic signal maintenance
Road Maintenance 2018
Materials for road and bikepath maintenance
Road Districts 2018
Township MFT projects
Pavement Markings 2018
Replacement on bituminous and concrete pavement
Pavement Management 2018
Testing pavement for ARGUS system
Pavements - Resurfacing, 3R or Reconstruction
2018 invest $9.3 million for 9 miles (6 locations)
•
Cuba Rd (IL Rte 59 to Ela Rd)
•
Deep Lake Rd (Gelden Rd to IL Rte 132)
•
Gelden Rd (Deep Lake Rd to Grass Lake Rd)
•
Greenleaf Ave (Washington St to IL Rte 120)
•
Martin Luther King Jr. Dr (Il Rte 43 to IL Rte 41)
•
St. Mary’s Rd (IL Rte 176 to IL Rte 60)
Recurring annual projects
Patch, signal maint., bike paths, trees, guardrail, etc.
JULIE locates 2018
Annual contract storm sewer locates
Microsurfacing 2018 (various locations)
Resurfacing