DOT | Page 13

What projects are new to this 5-year Program? System Preservation Projects – keep county highway pavements, bridges, bikeways, signals and related items in good condition Route or Project Name Work Description Arlington Heights Rd (Lake Cook Rd to IL Rte 83) Phase I engineering for reconstruction Detention Right of Way 2018 Future stormwater detention sites ITS PASSAGE network 2018 Upgrade existing equipment NPDES Phase II 2018 Annual inspections of storm sewer outfalls Signal Maintenance 2018 Traffic signal maintenance Road Maintenance 2018 Materials for road and bikepath maintenance Road Districts 2018 Township MFT projects Pavement Markings 2018 Replacement on bituminous and concrete pavement Pavement Management 2018 Testing pavement for ARGUS system Pavements - Resurfacing, 3R or Reconstruction 2018 invest $9.3 million for 9 miles (6 locations) • Cuba Rd (IL Rte 59 to Ela Rd) • Deep Lake Rd (Gelden Rd to IL Rte 132) • Gelden Rd (Deep Lake Rd to Grass Lake Rd) • Greenleaf Ave (Washington St to IL Rte 120) • Martin Luther King Jr. Dr (Il Rte 43 to IL Rte 41) • St. Mary’s Rd (IL Rte 176 to IL Rte 60) Recurring annual projects Patch, signal maint., bike paths, trees, guardrail, etc. JULIE locates 2018 Annual contract storm sewer locates Microsurfacing 2018 (various locations) Resurfacing Executive Summary • 5