Campus Update | Page 2

PROGRESS ON SITE STEM BLOCK • Structural insulated panels to STEM completed • Internal blockwork completed • Sprinkler installation ongoing • First fix electrical commenced • Polyester powder coated cladding commenced • Fire painting to steel frame in STEM ongoing • Window installation ongoing • Mono pitch roof light being fabricated The south block where the hospitality training restaurant will be positioned. SOUTH BLOCK • Steel frame completed • Precast flooring units installed • All ground floor slabs installed • Sips panels commenced • Internal blockwork ongoing • Fire painting ongoing Main entrance. NORTH BLOCK • Steel frame completed • Precast flooring units being installed • All ground floor slabs installed Work is due to commence including atrium and external works. This building will house the hair, beauty and care departments. AYRSHIRE COLLEGE TIME CAPSULE Students and staff have been asked to provide items to include in a time capsule which will be built into the new campus. NC Level 5 Social Science students took the lead with the project seeking objects/information that represents our time in history, news stories and personal memories. They have come up some great ideas including: • Receipts and labels for recent purchases • A day in the life of a Social Science student • Information about the Scottish Referendum • A look at what passes as entertainment in 2015 Students involved in the Ayrshire College time capsule project.