Architect and Builder Magazine South Africa January/February 2015 | Page 60
Artificial light in the
malls was dispersed by
the use of floating ‘light
boxes’ using printed
fabrics with motifs
Flow
The shopper flow was determined by the
strategic position of the major anchors and
nationals and carefully determining the tenant
mix in the project.
Five entrances for a 65,000 GLA mall
provide an entrance for every 13,000m2, which
is an average number in shopping malls of
this type.
HVAC
The major tenants are individually airconditioned in line with their own specific
HVAC design criteria, by means of roof
60
top type air cooled air-conditioning units
(ACPU’s). The ACPU’s all operate on R410A
refrigerant gas and incorporate economy
cooling and CO2 modulation functions with
the tenants having the ability to control
aspects of their air-conditioning systems via
local remote control panels.
The smaller line shops are air-conditioned
by a combination of energy efficient R410A
inverter type ducted split and ceiling mounted
cassette units in combination with ducted,
filtered fresh air systems.
Individual ducted ventilation systems serve
the public toilet areas.
Matlosana Mall