Architect and Builder Magazine South Africa January/February 2015 | Page 38

and lift areas. Change rooms and showers are provided in the basement parking for employees to refresh after a bicycle ride to the office. The fire protection system has been designed not to expel any water during testing. Water is directed back into storage tanks. Motion occupancy sensors detect when spaces are not occupied and switch off light fittings accordingly. At least 57% of the office area has natural daylight levels sufficient to allow lighting to be turned off during daylight hours. The superstructure is supported by 13 shear beams that span 31,9m x 1,5m x 2m at parking level 0 rubble removed from site was reused by Skipwaste in brick production. The site location is approximately 8 kilometres from Alexandra which is where the majority of general labour was sourced. The project aim was to source at least 80% of materials within 50 to 400 kilometres from the site and this objective was achieved. Sustainability The building has achieved a Four Star Green Star SA – Office V1 Design rating. A number of sustainable aspects include: Fuel-efficient vehicles are catered for with 33 parking bays provided. These parking bays are conveniently located near the escalators 38 Wet Services Apart from the standard Wet Services design applicable to a Green Star Building, Sutherland’s (formerly GK Pereira) design managed to capture a large percentage of the roof rainwater into a single piped system and collect this water into a concrete storage tank in the lowest basement. This water is then filtered, cleared and used for all toilet and urinal flushing throughout the building. One of the interesting challenges was how to get the rain water into a storage tank in the third basement level, with a street level overflow to rain water system, as well as having an automatic main council water by-pass for when there is no rain water available. This was achieved using a float control that would only allow council mains water into the tank when the rain water level dropped below 30% full. The building is fitted with an industrial kitchen to provide high level catering to all tenants. The kitchen drainage system is piped to a stainless steel grease separator and is fitted with non-return valves to ensure no soil contamination into the system. 15 Alice Lane South