Pro Installer February 2022 - Issue 107

PROINSTALLER . CO . UK THE VOICE OF THE TRADE
08 Grey matter
Out of 88,000 PVCu casements , what colours come out top ?
29 Product profile
D & I Windows weigh in on what makes the ‘ perfect ’ bifold door .
38 Testing times
Building our Skills delivers directly to fenestration fitters .
ISSUE 107 FEBRUARY 2022

FREE

41 Keep it Lite
The ‘ design studio ’ app at conservatory installers ’ fingertips .
Be part of the
with Intratone ’ s Interactive Digital Noticeboard
SEE PAGE 25

WINDOW SYSTEMS AND THE NEW PART L

WHAT THE INDUSTRY NEEDS TO KNOW

The Government has announced changes to Part L of the Building Regulations which will come into force from June 2022 . These are designed to reduce the carbon emissions of our buildings and will have significant implications for the design and construction of buildings – including window and façade systems .
What do the changes mean ?
The Future Homes Standard will demand new buildings produce at least 75 % less carbon emissions when compared to current levels . To ease the way the Government has introduced new Part L regulations as an interim measure , in which all new buildings will need to generate 30 % fewer CO 2 emissions than the current regulations allow .
The new legislation means the thermal regulations for windows and openings are changing . The current U-values for the thermal transmittance of windows and openings into all settings ( new and existing buildings ) are to be upgraded . Take a look at the documents below to see the specific changes in U-value per application :
Approved Document L , volume 1 : dwellings
Approved Document L , volume 2 : buildings other than dwellings
You can view the documents online by visiting https :// www . gov . uk / government / publications / conservationof-fuel-and-powerapproved-document-l
What you need to do
We ’ d urge specifiers , contractors , fabricators , and installers to start to prepare now . We recommend you familiarise yourself with the Future Building Standards document and ensure you understand implications for window systems as well as other parts of the building envelope .

Story continues on page 2 roof lantern

madefortrade . co 01642 610 799 sales @ madefortrade . co
Faster
Average installation under 30 mins
Warmer
Premium seals , class leading thermals
Stronger
3mX2.5m possible with no mid rafters
Slimmer
Seamless joints and cappings